An investment in an Upside Workshop or C-Trial option is justified, based on the stakes, if you have millions or billions in physical assets or have similar mission-intensive exposure.

 

Start enjoying the benefits of our Cost-of-Risk Failure Management software, risk advisory services, and Cost-of-Risk baselining, without breaking your budget or binding you up in a long term contract.  Read on for more info or connect here to test the waters and get underway.  You’ll see how Cost-of-Risk, Failure Management, and maintenance-reliability automation technology intimately combine to impact on your bottom line.

 

Actual risk allocations at noteworthy Fortune 500 company. By making the ‘Critical Machine Failure’ slice get smaller, we make the whole pie get smaller.

 

An Upside Workshop is a low-cost approach to assessing your opportunity.  Our MO is to asses your current failure management effort, followed by determining just how effective that effort SHOULD be in your circumstance (which is a key concept).  On that basis, we’ll recommend solutions needed and if desired, we’ll even implement them.  But it starts with booking an Upside Workshop and it ends with serious results.

cost-of-risk C-trial

 

 

Three Entry-level Cost-of-Risk C-Trials:

 

  1. BASIC ADVISORY SERVICES PACKAGE
  2. COST-OF-RISK BASELINE
  3. APERITISOFT™ 123 FM EXPRESS SOFTWARE

 

BASIC ADVISORY SERVICES PACKAGE

 

Engage one of our SMEs for a fraction of the cost of hiring a full-time employee or contractor.  You get the expertise you need, but with no more than a 90 day commitment at any time.

 

COST OF RISK BASELINE

 

Do you know your total cost of failure or how much risk has been costing your organization?  Our reliability experts utilize our patented ARQ Technology™ to find out.  Get the answers you need at a rate that will most likely surprise you!

 

APERITISOFT™ 123 FM EXPRESS SOFTWARE

 

Manage your Failure Management or other Risk Management Program as easy as 1-2-3. Build your risk register and manage your risks with the power tools you need to get the job done right, but at an introductory price.

upside workshop

 

 

Upside Workshop Subject Matter:

 

  1. Integrated failure management and maintenance process automation – at its core.
  2. The most advanced state-of-the-art technologies that are changing how machinery relates its health status to its human maintainers.
  3. Benefits of measurably linking automated reliability and maintenance activity to your asset care strategies and policies.
  4. Failure Management cost-of-risk quantification to ensure maximum ROI in physical asset maintenance.
  5. Valuation of the opportunity, based on your present failure risk, analysis of what the optimal failure risk should be in your context, and determination of how to achieve that level of performance.
  6. Cost-Benefit analysis of economic decision support and prognostic system technologies relevant to your physical assets.
  7. Introduction to how energy costs, associated with electric motor-driven equipment faults, can be eliminated.

 

 

Your access to the power of autonomous diagnostics, prognostics, cost optimization, and the most relevant and accurate approach to risk quantification and prioritization available, is only a call, click, or email away.  

 

 

 

The waters are deep so don’t go it alone.  Companies have tried, often finding that they were in over their heads and that they had failed to capitalize on the opportunity for not knowing what lurks beneath the surface.  Engage with us.  We will guide you to levels of failure management that actually correlate to your business operational requirements and measurably link to corporate finance.  We have the depth of experience to effectively assess your existing program and show you the best path forward, based on where your program is today versus where it needs to be in order to minimize your total cost of failure.

 

 

Asset care strategy, reliability, and failure management bear on financial statements pertaining to plant, machinery, equipment, and facilities.  Or maybe for you, it’s human life that could be at stake, or perhaps it’s that there could be an environmental release, or maybe it’s that the environment isn’t releasing its product fast enough.  Or maybe it’s just your competitive desire to get ahead.  Regardless, if you’ve got millions or billions in plants, machinery, and equipment or some other mission-intensive application, then you will derive value from our Cost-of-Risk baseline, Advisory Services, Aperitisoft™ C-Trials and Upside Workshops.  They can save you millions. 

And talk is cheap so let’s start there.