given conditions today, the asset manager or maintainer makes one of three decisions and considers cost implications:

 

  1. Intervene immediately and conduct maintenance on equipment now?  Or,
  2. Plan to conduct maintenance within a specified time?  Or,
  3. Defer the maintenance decision until the next CBM observation?  And,
  4. What are the cost implications of repair versus replace?

exakt integrates your multivariate data to calculate RUL, probability of failure, and optimal timing, with respect to cost, of repair/replace intervention

 

  • Optimum % balance of preventive replacement and predictive or run-to-failure maintenance
  • Cost impact related to current practice
  • Statistical validity of alternative models
  • Remaining useful life
  • Expected time between replacements
  • Traffic light graph with a current status trend line and
    “Replace/Don’t Replace” conclusion.

 

 

 

 

results of Very complex calculations presented in simple graphical format

 

  • Relates condition variables to failure modes with statistical confidence levels and thereby enables the company to stop collecting and analyzing low-impact data
  • Gives the equipment maintainer or operator a high level of confidence that the equipment will not fail before the end of a required performance or production window
  • Reduces maintenance costs by optimizing the blend of preventive and condition-based replacements or run-to-failure
  • Provides for orderly replacement planning by predicting remaining useful life
  • For complex equipment, increases the accuracy of failure prediction by operating at the component level
  • Provides accurate and consistent prediction model for each piece of equipment
  • Easy to read graphical output shows results at a glance.